E. [email protected] T. 0333 016 5253
Time-lapse construction image capturing vital roadworks at Coast Road Junction.

News Dual-camera systems capture new triple-decker roundabout in Newcastle

19 July 2019 Kate

We time-lapse the transformation of the A19/A1058 Coast Road into the North East’s first triple-decker junction.

With the first camera system positioned on the northbound side of the roundabout, and camera two on the opposite side, we could encompass the full scale of these complex works.

Working with our client WSP, we identified two ideal positions to site independent towers onto which to install our systems. These were chosen not only to achieve the best possible angles, but also with all operatives’ safety in mind as well, with work taking place so close to the highway.

For two years of closely monitored time-lapse capture, we documented the realignment of the A19, which now runs underneath the existing roundabout – with the A1058 across the top.

Joining two of the busiest routes in North Tyneside, the changes at Coast Road Junction are already showing signs of reduced congestion and improved traffic flow. As part of our full end-to-end professional service, we ensured all key processes that ultimately contributed to this improvement were fully recorded.

This was done through the very careful micro-management we are known for, ensuring all details – from initial groundworks, to critical beam installation and final surface treatment – were properly documented for the final edit, along with incremental videos at key stages.

Our time-lapse footage was also used by main contractor on site, John Sisk & Son, as part of a comprehensive video overview of the project shared widely with the public.

Highways England & other road improvements

This is just one of many other Highways England projects where our professional time-lapse solutions have been chosen to not only visualise, but help to validate the important work undertaken by the organisation.

We have captured developments across the UK which involve various types of road traffic works, including:

  • A £10m redevelopment of the M3 Black Dam “half-hamburger” roundabout in Basingstoke
  • Traffic flow improvements at the M27 Junction 5 roundabout at Eastleigh.
  • A 1,500-tonne bridge replacement at Thorley Lane on the M56, near Manchester Airport (with our colleagues at Aerial Images).
  • Construction of a new junction, slip road and a £28m new Park & Ride facility at Tipner, near Portsmouth.

This extensive portfolio comprised of detailed, elaborate undertakings by Highways England and other organisations & contractors, affirms our skills & expertise for capturing work in this particular sector.

Related Tags

0333 016 5253 [email protected]

Time-Lapse Systems are a part of Hideaway Media Ltd (est. 2007). World leader in the provision of bespoke time-lapse capture and site monitoring solutions. UK and Worldwide.