Case Study Chichester College and Crawley College Time-Lapse

19 March 2026 Holly Eckersley
Chichester College Group appointed us at Time-Lapse Systems to deliver construction time-lapse documentation across two major education developments in West Sussex: the new STEM and Higher Education Centre at Chichester College and the technology training facility at Crawley College. Operating within live campus environments, we captured every stage of the build, creating a clear, continuous visual record from early works through to completion. For contractors, consultants and client-side decision makers, construction time-lapse photography provides more than visual content. It strengthens stakeholder communication, evidences programme progress and creates a permanent archive of complex site activity. These projects demonstrate how construction camera systems add measurable value on education schemes where safety, coordination and public visibility are critical. By documenting both developments over the full construction lifecycle, we created long term visual assets that support reporting, engagement and project legacy.

 

Chichester College Group commissioned us at Time-Lapse Systems to document two significant education construction projects across West Sussex: the new STEM & Higher Education (HE) Centre at the Chichester campus and a major new technology training facility at Crawley College. Across both sites, our time-lapse cameras captured the progression of complex live construction environments, creating a permanent visual record of projects designed to support the next generation of technical education.

These developments represent a major investment in regional skills infrastructure, providing modern facilities that will train future engineers, construction professionals and digital specialists.

 

 

Project Fact file

Client:
Chichester College Group
Contractor / Developer:
Willmott Dixon
Location:
Chichester College Campus – Chichester, West Sussex
Crawley College Campus – Crawley, West Sussex
Time-Lapse Duration:
12 months
Camera Deployment:
Long-term, fixed-position construction time-lapse cameras installed across both campuses

 

The Challenge

Education construction projects present a unique set of logistical and operational considerations.

Both developments were delivered within live college campuses, requiring construction activity to coexist alongside ongoing teaching, student movement and day-to-day campus operations. This created additional challenges around site access, safety management and stakeholder communication throughout the programme.

At the Chichester campus, the project involved construction of a new STEM and Higher Education Centre, replacing older facilities and creating a modern learning environment focused on science, technology and engineering disciplines.

Meanwhile at Crawley College, the project formed part of the development of the Sussex & Surrey Institute of Technology, a major investment designed to expand specialist training in engineering, construction and digital skills for the region.

For both projects, stakeholders required a clear and consistent visual record of the build programme, providing transparency around construction progress while also creating long-term visual assets for communication and promotion.

Our Approach

We deployed dedicated construction time-lapse cameras at both sites, carefully positioned to capture the full construction programme from groundworks through structural development and final completion.

Camera locations were selected to ensure:

  • clear visibility of key construction phases

  • wide coverage of site activity

  • consistent framing throughout the full build programme

Our systems captured high-resolution imagery at scheduled intervals throughout the day, producing a reliable visual archive of each project. This imagery was then processed to create both short-form highlight sequences and complete time-lapse films documenting the entire construction journey.

For the project teams, this provided a clear visual timeline that could support stakeholder updates, internal reporting and wider communications around the development of the new facilities.

 

The Outcome

The completed time-lapse sequences now provide a comprehensive visual record of two major education construction projects delivered across the Chichester College Group estate.

At the Chichester campus, the new STEM & Higher Education Centre now provides a dedicated hub for advanced technical learning, supporting students preparing for careers in science, engineering and technology.

At Crawley College, the Sussex & Surrey Institute of Technology creates a new regional centre for high-level technical training in engineering, construction and digital disciplines.

For the client, the time-lapse documentation delivers several long-term benefits:

  • a permanent visual record of construction progress

  • professional media assets for marketing and recruitment

  • engaging content for stakeholder communications

  • documentation of a significant investment in education infrastructure

For contractors and delivery partners, the footage also provides a powerful visual record of the complexity involved in delivering major construction projects within live campus environments.

By Numbers

Chichester College
14
months
21,083
images captured

Crawley College
18
months
23,707
images captured

Major education construction projects deserve to be documented properly.

If you are delivering a new college building, university facility or specialist training centre, our construction time-lapse systems provide a clear visual record of your project from start to completion. Please get in touch if you would like an informal discussion about how we might help you.

0333 016 5252 [email protected]

Time-Lapse Systems are a part of Hideaway Media Ltd (est. 2007). World leader in the provision of bespoke time-lapse capture and site monitoring solutions. UK and Worldwide.